Preparation of Detailed Engineering Design and Construction Supervision of Environmental Sanitation Infrastructure for Akplabanya in the Dangme East District in the Greater Accra Region

Preparation of Detailed Engineering Design and Construction Supervision of Environmental Sanitation Infrastructure for Akplabanya in the Dangme East District in the Greater Accra Region

  • Current Status of the ProjectCompleted
  • Project HeadMr. Lukman
  • ClientGreater Accra Regional Coordinating Council/Dangme East District Assembly
  • Year of projectDecember 2011 - February 2013

Main deliverables/outputs include the following:

• Topographical surveys and geotechnical investigations
• Updating of existing Engineering designs of selected facilities
• Production of detailed architectural and structural drawings
• Design of appropriate low-cost public and neigbourhood, school toilet blocks and solid waste skip holding bay, and priority sullage and drainage works
• Update of designs & block drawings, costs and procurement of works/services
• Construction supervision & preparation of Facilities Operation and Maintenance Handbook (FOM-H)
• General Contract Management Reporting
• Post-Construction Services
• Preparation of Facilities Management Plans (FMP)