-
Development of Technic...
WASH baseline survey, assessment of the septage /faecal sludge management system (FSM) –i.e. generation, collection, transport and treatment/disposal) in 12 rural and peri-urban communities in four
Read more -
Feasibility Study for ...
Main deliverables/outputs include the following: • Transfer Station Needs Assessment: Conducting a transfer station break even analysis and GIS-based spatial analysis to determine economic justific
Read more -
Technical Assistance t...
Deliverables/outputs include the following: • Training and capacity development of staff of Waste Management Department of the Accra Metropolitan Assembly (WMD-AMA) • Development of tools and re
Read more -
Design and Constructio...
Main deliverables/outputs include the following: • Preparation of detailed design drawings for capping, leachate and stormwater control • Preparation of a decommissioning, aftercare and afteru
Read more