Main deliverables/outputs include the following
- Topographical surveys and geotechnical investigations
- Updating of existing Engineering designs of selected facilities
- Production of detailed architectural and structural drawings
- Design of appropriate low-cost public and neighbourhood, school toilet blocks and solid waste skip holding bay, and priority sullage and drainage works
- Update of designs & block drawings, costs and procurement of works/services
- Construction supervision & preparation of Facilities Operation and Maintenance Handbook (FOM-H)
- General Contract Management Reporting
- Post-Construction Services
- Preparation of Facilities Management Plans (FMP)